POSTING FOR PRACTICE
ritanbriaUser is Offline
New Member
New Member
Send Private Message
Posts:2

--
15 Aug 2007 12:43 AM
Yea Jumpin In. I just came to this site, don't know what I am doing. Need a solar answer or two.
ritanbriaUser is Offline
New Member
New Member
Send Private Message
Posts:2

--
15 Aug 2007 12:45 AM
Am I in the right place?
ARdolsonUser is Offline
New Member
New Member
Send Private Message
Posts:14

--
23 Feb 2008 03:37 PM
no this is a testing area (I'm just testing.)
Father of the PawUser is Offline
New Member
New Member
Send Private Message
Posts:8

--
27 Feb 2008 11:58 PM
Am planning a sip room addition and roof addition onto a strucure after a fire. Surviving section is standard 8' stud walls encased in a classic limestone block exterior, roughly 40' lng(would not be practical to replace with sips) adjoining sip wall section replaces 25'' section destroyed in fire. Had originally planned on using 30' attic trusses resting on top double plates over top of both sections. With trusses bottom chord serves as both 1st floor cieling and attic floor. To rebuild with sips would it be necessary to go with a taller panel (8' 8" or so) and use blocking to bump up the plate height of existing walls to accomidate joist hangers or is it possible to attach a hanger in the area where the roof panel meets the 8' stud/8' sip wall section? Might an engineerd truss/sip hybrid be feasable utilizing non structural panels? I just recently happened onto sips and am pretty much sold on the benefits, but part of me still loves the idea of multi tasking engineered truss. Any comments?
zeyUser is Offline
New Member
New Member
Send Private Message
Posts:4

--
11 Aug 2008 08:19 PM
i am trying to figure out where the real post box is.......

HolmesEcoDesignUser is Offline
New Member
New Member
Send Private Message
Posts:11

--
24 Dec 2008 01:42 AM
Posted By ARdolson on 02/23/2008 3:37 PM
no this is a testing area (I'm just testing.)


How does this quote thing work?
HolmesEcoDesignUser is Offline
New Member
New Member
Send Private Message
Posts:11

--
24 Dec 2008 01:43 AM
i am trying to figure out
HolmesEcoDesignUser is Offline
New Member
New Member
Send Private Message
Posts:11

--
24 Dec 2008 01:44 AM
Posted By zey on 08/11/2008 8:19 PM
i am trying to figure out where da box is.......



What da monkey?
HolmesEcoDesignUser is Offline
New Member
New Member
Send Private Message
Posts:11

--
24 Dec 2008 01:45 AM
Surviving section is standard 8' stud walls encased in a classic limestone block exterior, I think I've figured it out
HolmesEcoDesignUser is Offline
New Member
New Member
Send Private Message
Posts:11

--
24 Dec 2008 01:46 AM
Posted By Father of the Paw on 02/27/2008 11:58 PM
Surviving section is standard 8' stud walls encased in a classic limestone block exterior,


I think I got it.
BrawlerUser is Offline
Basic Member
Basic Member
Send Private Message
Posts:154

--
09 Mar 2009 09:42 AM
Posted By Father of the Paw on 02/27/2008 11:58 PM
Am planning a sip room addition and roof addition onto a strucure after a fire. Surviving section is standard 8' stud walls encased in a classic limestone block exterior, roughly 40' lng(would not be practical to replace with sips) adjoining sip wall section replaces 25'' section destroyed in fire. Had originally planned on using 30' attic trusses resting on top double plates over top of both sections. With trusses bottom chord serves as both 1st floor cieling and attic floor. To rebuild with sips would it be necessary to go with a taller panel (8' 8" or so) and use blocking to bump up the plate height of existing walls to accomidate joist hangers or is it possible to attach a hanger in the area where the roof panel meets the 8' stud/8' sip wall section? Might an engineerd truss/sip hybrid be feasable utilizing non structural panels? I just recently happened onto sips and am pretty much sold on the benefits, but part of me still loves the idea of multi tasking engineered truss. Any comments?


BrawlerUser is Offline
Basic Member
Basic Member
Send Private Message
Posts:154

--
09 Mar 2009 09:43 AM
Posted By Father of the Paw on 02/27/2008 11:58 PM
Am planning a sip room addition and roof addition onto a strucure after a fire. Surviving section is standard 8' stud walls encased in a classic limestone block exterior, roughly 40' lng(would not be practical to replace with sips) adjoining sip wall section replaces 25'' section destroyed in fire. Had originally planned on using 30' attic trusses resting on top double plates over top of both sections. With trusses bottom chord serves as both 1st floor cieling and attic floor. To rebuild with sips would it be necessary to go with a taller panel (8' 8" or so) and use blocking to bump up the plate height of existing walls to accomidate joist hangers or is it possible to attach a hanger in the area where the roof panel meets the 8' stud/8' sip wall section? Might an engineerd truss/sip hybrid be feasable utilizing non structural panels? I just recently happened onto sips and am pretty much sold on the benefits, but part of me still loves the idea of multi tasking engineered truss. Any comments?


HEEEEEEEEE
BrawlerUser is Offline
Basic Member
Basic Member
Send Private Message
Posts:154

--
09 Mar 2009 09:44 AM
Posted By Father of the Paw on 02/27/2008 11:58 PM
Am planning a sip room addition and roof addition onto a strucure after a fire. Surviving section is standard 8' stud walls encased in a classic limestone block exterior, roughly 40' lng(would not be practical to replace with sips) adjoining sip wall section replaces 25'' section destroyed in fire. Had originally planned on using 30' attic trusses resting on top double plates over top of both sections. With trusses bottom chord serves as both 1st floor cieling and attic floor. To rebuild with sips would it be necessary to go with a taller panel (8' 8" or so) and use blocking to bump up the plate height of existing walls to accomidate joist hangers or is it possible to attach a hanger in the area where the roof panel meets the 8' stud/8' sip wall section? Might an engineerd truss/sip hybrid be feasable utilizing non structural panels? I just recently happened onto sips and am pretty much sold on the benefits, but part of me still loves the idea of multi tasking engineered truss. Any comments?


BrawlerUser is Offline
Basic Member
Basic Member
Send Private Message
Posts:154

--
09 Mar 2009 09:57 PM
Posted By Father of the Paw on 02/27/2008 11:58 PM
Am planning a sip room addition and roof addition onto a strucure after a fire. Surviving section is standard 8' stud walls encased in a classic limestone block exterior, roughly 40' lng(would not be practical to replace with sips) adjoining sip wall section replaces 25'' section destroyed in fire. Had originally planned on using 30' attic trusses resting on top double plates over top of both sections. With trusses bottom chord serves as both 1st floor cieling and attic floor. To rebuild with sips would it be necessary to go with a taller panel (8' 8" or so) and use blocking to bump up the plate height of existing walls to accomidate joist hangers or is it possible to attach a hanger in the area where the roof panel meets the 8' stud/8' sip wall section? Might an engineerd truss/sip hybrid be feasable utilizing non structural panels? I just recently happened onto sips and am pretty much sold on the benefits, but part of me still loves the idea of multi tasking engineered truss. Any comments?


BrawlerUser is Offline
Basic Member
Basic Member
Send Private Message
Posts:154

--
09 Mar 2009 09:59 PM
Posted By Father of the Paw on 02/27/2008 11:58 PM
Am planning a sip room addition and roof addition onto a strucure after a fire. Surviving section is standard 8' stud walls encased in a classic limestone block exterior, roughly 40' lng(would not be practical to replace with sips) adjoining sip wall section replaces 25'' section destroyed in fire. Had originally planned on using 30' attic trusses resting on top double plates over top of both sections. With trusses bottom chord serves as both 1st floor cieling and attic floor. To rebuild with sips would it be necessary to go with a taller panel (8' 8" or so) and use blocking to bump up the plate height of existing walls to accomidate joist hangers or is it possible to attach a hanger in the area where the roof panel meets the 8' stud/8' sip wall section? Might an engineerd truss/sip hybrid be feasable utilizing non structural panels? I just recently happened onto sips and am pretty much sold on the benefits, but part of me still loves the idea of multi tasking engineered truss. Any comments?


BrawlerUser is Offline
Basic Member
Basic Member
Send Private Message
Posts:154

--
10 Apr 2009 08:36 AM
Posted By HolmesEcoDesign on 12/24/2008 1:43 AM
i am trying to figure out


ooooooooooooooooooooo
cajundrillerUser is Offline
New Member
New Member
Send Private Message
Posts:13

--
14 Apr 2009 08:53 AM

How do you post?

 

William Wainwright
BrawlerUser is Offline
Basic Member
Basic Member
Send Private Message
Posts:154

--
22 Jun 2009 11:37 AM
Posted By Father of the Paw on 02/27/2008 11:58 PM
Am planning a sip room addition and roof addition onto a strucure after a fire. Surviving section is standard 8' stud walls encased in a classic limestone block exterior, roughly 40' lng(would not be practical to replace with sips) adjoining sip wall section replaces 25'' section destroyed in fire. Had originally planned on using 30' attic trusses resting on top double plates over top of both sections. With trusses bottom chord serves as both 1st floor cieling and attic floor. To rebuild with sips would it be necessary to go with a taller panel (8' 8" or so) and use blocking to bump up the plate height of existing walls to accomidate joist hangers or is it possible to attach a hanger in the area where the roof panel meets the 8' stud/8' sip wall section? Might an engineerd truss/sip hybrid be feasable utilizing non structural panels? I just recently happened onto sips and am pretty much sold on the benefits, but part of me still loves the idea of multi tasking engineered truss. Any comments?


BrawlerUser is Offline
Basic Member
Basic Member
Send Private Message
Posts:154

--
22 Jun 2009 11:39 AM
in fire. Had originally planned on using 30' attic trusses resting on top double plates over top of both sections. With trusses bottom chord serves as both 1st floor cieling and attic floor. To rebuild with sips would it be necessary to go with a taller panel (8' 8" or so) and use blocking to bump up the plate height of existing walls to accomidate joist hangers or is it possible to attach a hanger in the area where the roof panel meets the 8' stud/8' sip wall section? Might an engineerd truss/sip hybrid be feasable utilizing non structural panels? I just recently happened onto sips and am pretty much sold on the benefits, but part of me still loves the idea of multi tasking engineered truss. Any comments?


You are not authorized to post a reply.

Active Forums 4.1
Membership Membership: Latest New User Latest: Pat Miller New Today New Today: 4 New Yesterday New Yesterday: 20 User Count Overall: 17243
People Online People Online: Visitors Visitors: 704 Members Members: 58 Total Total: 762

GreenBuildingTalk

Welcome to GreenBuildingTalk, the largest, most active forum on green building. While you can browse the site as a guest, you need to register in order to post.

Register Member Login Forum Home

Search Directory

Professionals Products

Get Free Quotes

Tell us about your building project and get free quotes from green building professionals. It's fast & easy! Click here to get your free quote.

Site Sponsors

For Advertising Info:
Call 866-316-5300 or 312-223-1600

Professionals Serving Your Area:

Copyright 2010 by BuildCentral, Inc.   Terms Of Use  Privacy Statement  Free Quotes  Professional Directory  Advertising Programs